Permits for the construction of boreholes

Permits for the construction of boreholes

Preparation of documentation for obtaining a groundwater abstraction permit for new groundwater abstraction facilities

Documents required:

  • Application form for the issuance of a permit under Article 44, paragraph 1 in conjunction with Article 52, paragraph 1 of the Act on Water Supply. 44(1)(4) of the Water Act, containing:

– Applicant’s details;

– Details of the water body use and abstraction

– Number of the decision of the Minister of Environment and Water or of the Director of the relevant Regional Inspectorate for

of the Regional Inspectorate for Environment and Water on the environmental impact assessment or on the assessment that an environmental impact assessment or a compatibility assessment is not necessary, where required under the Environmental Protection Act and the Biodiversity Act.

– Certified proof of payment of the permit fee (Article 60(2)(1) of the Water Act);

– A current sketch or map of the properties where the use of a water body and water abstraction will take place, certified by the relevant competent authority (Article 60(2)(2) of the Water Act);

– Declaration of the circumstances referred to in Article 71(2) of the Environmental Protection Act (by the model attached to the application);

– Ownership document or notarized written consent from the owner of the property where the water abstraction facilities will be located.

– A notarized statement from the owners of the property to be affected by the sanitary sewer project.

zone, certifying that they are aware of the restrictions and prohibitions outlined in the ordinance under Article 135, Par. 1, item 6, which fall within the project sanitary protection zones – in case of use of a water body for the construction of facilities and water abstraction intended for independent drinking water supply (The document shall be drawn up with the content by Article 152 of the Ordinance No. 1 on exploration, use and protection of groundwater)

– Justification of the water abstraction, including justification of the requested water quantity, according to the water consumption norms set by the Ordinance under Article 117a, paragraph 2. (Pending the adoption of the Ordinance on the alignment of Ordinance No. 1 on the exploration, use and protection of groundwater with the Law on Water Supply, the justification of the water abstraction shall be prepared with the content of the Water Abstraction Project set out in Article 156, the part of the Facilities Construction Project defined in Article 160, Paragraph 1, Item 2 and Paragraph 2, Items 2 and 3 and Paragraph 4 and the Justification of the Requested Water Quantity defined in Article 151 of Ordinance No. 1 on Groundwater Exploration, Use and Protection. Pending the adoption of the Regulation under Article 117a, paragraph 2, the justification of the requested water volumes shall be developed based on the quantities determined by other normative acts for the respective purpose, and the justification of the required water volumes shall also indicate the name of the relevant normative act – § 140 of the PDD of the Law on Water Supply, in force since 10.08.2010).

After completion of all activities, tests and analyses stipulated in the Construction Permit, the same shall be submitted to the Basin Directorate in the form of a Field Work Report – Geological Log. The results of all tests conducted shall be interpreted by a hydrogeologist and included in the report documentation.

Documents required to complete the documentation:

– Applicant Details;

– Water body use and abstraction data

– A current sketch or map of the properties where the water body use and water abstraction will take place, certified by the relevant competent authority (Article 60(2)(2) of the Water Act);

– Ownership document or notarized written consent from the owner of the property where the

water abstraction facilities.

– A notarized statement from the owners of the property to be affected by the sanitary sewer project.

zone, certifying that they are aware of the restrictions and prohibitions outlined in the ordinance under Article 135, Par. 1(6), which

fall within the project sanitary protection zones – in the case of use of a water body for

construction of facilities and for water abstraction,

intended for self-supply of drinking water (The document shall be drawn up by Article 152 of the

Ordinance No. 1 on the exploration, use and protection of groundwater)

– Certificates of inputs;

– Geological log;

– Results of the FIA;

– Groundwater laboratory analysis results;